HVAC and Chiller Retrofit
in Supermall
West Java | Bekasi
HVAC dan Chiller
Retrofit in Supermall
West Java | Bekasi
HVAC Audit
TEDES conducted an audit of the existing HVAC system and carried out an identification and condition check of the mall.
Analyze & Calculate
TEDES identified the existing units and performed calculations to estimate energy savings based on the current usage, as well as conducted piping calculations.
HVAC Design & Equipment Selection
The new system will be able to achieve approximately 35% power saving compare to the existing system. The new system also will require less maintenance and easier operation.
Implementation
TEDES will do the procurement, construction up to testing and commissioning of the system.
Operation & Maintenance
As an option TEDES could provide operation and maintenance the whole system, so customer could focus on their mall operation.